Bridge Painting Starts Today on Missouri River Bridge West of Mobridge

Paint Supplies

 

MOBRIDGE, S.D. – (DRG News) The South Dakota Department of Transportation says that painting is being done on the Missouri River Bridge on U.S. Highway 12 west of Mobridge. The work started today and should take four to five weeks to complete. The DOT says traffic will be reduced to one lane on the bridge during the working hours and will be controlled by flaggers. Normal two-way traffic will be restored during non-working hours. The contractor will accommodate over-width loads by moving equipment off the bridge, as needed.


Comment Disclaimer: The views and opinions expressed in the comments section of DakotaRadioGroup.com are solely those of the comment author and do not necessarily reflect the views and opinions held by DakotaRadioGroup.com.


Multimedia